Johnson, Mirmiran & Thompson (JMT) is
preparing a Preliminary Engineering Report
(PER) for Woodlea Road, from Lane Park
Road to S.R. 19 for Lake County. This study is
being conducted to identify and evaluate
impacts in the corridor that will meet future
growth and traffic
demands for the area.
The results of this
analysis will provide the
basis for the selection of
the recommended
improvements for this
project.
The proposed Woodlea Road typical section
will consist of one 12-foot travel in each
direction, with curb and gutter (a closed
drainage system) on both sides. The typical
section will also include a 5-foot sidewalk on
the
|
south side and a multi-purpose trail on the north side. A multi-purpose trail is on the north side
from Lane Park Road to the future Captain Haynes Road.
A Public Workshop was conducted to get input from the Public on Tuesday, August 1, 2006
at the Lake County Agriculture Center, 1951 Woodlea Road, Tavares, Florida.
The Preliminary Engineering Report is currently under review. The project will move into the Design Phase once this report is approved. |
Mr. Fred Schneider, P.E.
Lake
County Public Works, Project Manager
123 N. Sinclair
Avenue
Tavares, Florida 32778
Phone: 352-253-4952,
email:fschneider@co.lake.fl.us
|
Mr.
Wayne Waters
Johnson,
Mirmiran & Thompson
615 Crescent
Executive Court
Suite 106 Lake
Mary, Florida 32746
Phone: 407-562-4958,
email:wwaters@jmt.com
|